|
ERCS opened
its doors on rented property in 1994. The school consists of a main school
building, housing the office, food service area, bathrooms, and library, 4
stand alone classrooms, a pump house, and outside bathrooms built in 2003.
The school was forced to purchase the properties over the past few years.
This has been accomplished, but has imposed a financial hardship on the
school. The Eel
River Charter
School continues to
make facility upgrades in accordance with county building codes, and
improvements to the school site as funding becomes available. The school
facility is maintained at a level that protects the safety of the students,
staff and general public. Class size is limited due to space restrictions
in the classrooms.
Monthly safety inspections are held,
and any deficits are corrected as quickly as possible. A new yard fence was
completed in 2006 improving the safety of the students. Visitors are
required to sign in at the office, and students are supervised before and
during school hours. After school hours, the school is posted as generally
unavailable for public use.
Major
facilities upgrades are budgeted as necessary, and due to generous
donations, ERCS has almost completed remodeling the food service area. In
2003, new pavement was added for walkways, a basketball court, and a play
area for the younger students. In 2004, the school main building was
painted to match the pump house, modular classrooms and new bathrooms. The
library was re-roofed in 2003 and painted in 2005. The school is cleaned on
a daily basis and restrooms are maintained in good repair. The garbage and
recyclable materials are stored in an enclosed area which was constructed
in 2004. The interior of the main building received a new coat of paint,
lighting, and resurfacing of the floor in 2007, due to the hard work of
parent and community members volunteering their labor and business’
donating a portion of the paint cost.
|